Over the past several months we've been working hard on the site preparation for the 2015 U.S. Open. Here are a few pictures of the renovation process of the 7th green that has taken place over the last three months.
| #7 (before) |
| Rough Shaping |
| Excavated cavity...ready for drainage and gravel blanket |
| Drainage and gravel blanket installed |
| Irrigation installation |
| Sand-capped and working on finish grading |
| Hydroseeding (day 1) |
| Hydroseeding (day 2) |
| Hydroseeding (day 2) |
| Hydroseeding (day 3) |
| View from #5 fairway |
| View of the finished complex looking up #7 fairway |