Over the past several months we've been working hard on the site preparation for the 2015 U.S. Open. Here are a few pictures of the renovation process of the 7th green that has taken place over the last three months.
#7 (before) |
Rough Shaping |
Excavated cavity...ready for drainage and gravel blanket |
Drainage and gravel blanket installed |
Irrigation installation |
Sand-capped and working on finish grading |
Hydroseeding (day 1) |
Hydroseeding (day 2) |
Hydroseeding (day 2) |
Hydroseeding (day 3) |
View from #5 fairway |
View of the finished complex looking up #7 fairway |